Advisory Services
Independent advisory across three critical phases of every interior project — from the first quotation to the final handover.
Phase One
The most critical phase — and the one most homeowners skip. Before you sign anything, you need an independent review.
Whether you're comparing Livspace vs HomeLane vs an independent architect vs a local contractor, the quotations you receive are rarely comparable on their own. Line items are named differently, inclusions vary, and exclusions are buried in fine print. I help you cut through the noise.
Side-by-side analysis of multiple vendor quotes — normalised so you're comparing like with like, not apples with oranges.
A detailed review of the Bill of Quantity to identify missing items, vague specifications, and scope gaps that could become costly change orders.
Background assessment of the vendor's track record, execution capability, and whether their team can actually deliver what they've promised.
Line-by-line review of payment terms, penalty clauses, warranty commitments, and exit provisions — flagging every clause that doesn't protect you.
Phase Two
Once work begins, the real risks emerge. Materials get substituted. Timelines slip. Payments are requested ahead of progress.
Most homeowners have no way to verify whether what's being installed matches what was agreed. I provide ongoing advisory support so you're never making decisions blind — and never paying for work that hasn't been done.
Periodic assessment of work completed against agreed milestones — so payments are tied to actual progress, not vendor requests.
On-site checks to confirm that materials being installed match the specifications in your BOQ — brand, grade, and finish.
Advice on when to release payments, how much to hold back, and how to structure disbursements to maintain leverage throughout the project.
If disputes arise — delays, substitutions, quality issues — I help you escalate effectively and document everything correctly.
Structured quality checks at key project stages: civil work, electrical, plumbing, carpentry, and finishing — before they're covered up.
Phase Three
The handover stage is where most homeowners lose their leverage. Once the final payment is made, getting issues resolved becomes significantly harder.
I help you conduct a thorough inspection before you sign off — so you're not discovering problems six months later when the vendor has moved on.
A comprehensive walkthrough to identify and document all incomplete, defective, or non-conforming work before handover.
Detailed inspection against your original specifications — finishes, fittings, hardware, and functional elements.
Confirmation that all agreed items have been delivered, warranties have been provided, and the project is genuinely complete before final payment is released.
"I don't tell you which vendor to choose. I give you the information to make that decision yourself — with confidence."
Most problems on site were created on paper. They just weren't caught in time.
Before a single nail goes into a wall, your project exists entirely on paper — design drawings, 3D visuals, BOQ, and material specifications. This is the stage where everything looks perfect. Polished 3D renders. A detailed BOQ. A confident designer.
But here is what most homeowners never find out until it's too late:
The 3D render and the actual working drawing are often two completely different things. What looks beautiful in a visual may be structurally impossible, dimensionally incorrect, or simply not what was priced in the BOQ.
This is what a Design Quality Check addresses.
What I Review in a DQC
Does the 3D render your designer showed you actually match the working drawings? Or is the 3D just a sales tool — and the real execution plan is something different?
Every item shown in the drawing should appear in the BOQ — and every item in the BOQ should be traceable back to the drawing. Gaps here mean either something won't get built, or you'll be charged for it as an "extra" later.
Are the materials specified in the BOQ actually the same grade, finish, and brand shown in the design? Downgrading materials at execution stage is one of the most common ways clients lose money without realising it.
Are the dimensions on the drawings correct and consistent? Do the furniture sizes actually fit the room? Is there enough clearance for doors, movement, and ventilation? Measurement errors discovered on site lead to rework, delays, and disputes.
This is the most critical part — and the one most often skipped. Can what is shown in the drawing actually be built? False ceilings at certain heights, wall panel alignments, structural cuts, plumbing routing — some design decisions look good on screen but create serious problems during execution. I flag these before work begins.
Why This Stage Matters More Than Any Other
Once execution begins, every correction costs money — sometimes far more than the correction itself. A wall that needs to come down. A ceiling that needs to be redone. A cabinet that doesn't fit because the measurement was off by 3 inches.
Every rupee saved after a mistake is smaller than every rupee saved before one.
A DQC is not about finding fault with your designer. It is about making sure that what you've been shown, what you've been quoted, and what will actually be built are all the same thing.
In most projects — they are not.
This is the only point in your project where a single review can prevent months of site problems, unexpected costs, and irreversible mistakes. Once construction begins, the window to course-correct closes fast.
Get Started
Book a short consultation and I'll tell you exactly where you are and what you need.